zerosaturation
|
182cc812ce
|
docs(statistic): add 本期实施范围 chapter to design doc + implementation plan
- design doc §0.1 scope matrix (16 items: 8 ✅ in, 8 ❌ out)
- 4-phase breakdown (P1-P4) with cycle estimates
- P1 末 precheck list (10 items) with real method names
- plan doc 3014 lines, 16 tasks, 126 checkboxes
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
|
2026-06-08 17:20:53 +08:00 |
|